Planning and prep

How to prepare for flooring installation: a week-by-week checklist

By [CONFIRM] owner or lead installer name · · 6 min read

Most of the work of preparing for a new floor happens two to four weeks out: confirm the product, book condo elevators if you need them, plan where furniture and people will go, and get the material into the home so it can acclimate. The day before, clear the rooms and set up a pet-free, kid-free zone. During the install, keep the heating or cooling running normally and stay out of the work area. After, give the floor time before heavy furniture and rugs go back.

Use the checklist below as a working list. Print it, tick it off, and you will avoid the most common delays.

Two to four weeks before

Confirm the details on paper

  • Read the quote line by line. Check that removal, prep, underlay, trims, transitions and stairs are all listed. If something is missing, ask now, not on install day. Our cost guide has a table of what a full quote should show.
  • Confirm the exact product, colour and quantity ordered, including the waste allowance.
  • Confirm the start and finish dates in writing.
  • Decide what happens to the old floor (haul-away is usually part of the quote).
  • Choose any new baseboards or quarter round now, so they arrive with the floor.

If you live in a condo

  • Get the renovation agreement and any flooring or acoustic rule from management.
  • Submit the approval package (product specs, underlay specs with test reports, contractor insurance and WSIB). Our condo flooring guide lists what boards usually ask for.
  • Book the service elevator for each visit: delivery of material, the install itself, and removal of old flooring if that happens on a separate day.
  • Check loading dock times, parking for the crew’s vehicle and permitted work hours.
  • Tell your neighbours below and beside you. A short note goes a long way.

Plan for daily life

  • Work out which rooms will be out of use and for how long.
  • If the kitchen is affected, plan simple meals or a temporary kitchen elsewhere.
  • If bedrooms are affected, plan where everyone will sleep.
  • If stairs are being done, plan another way up and down or a time when nobody needs the upper floor. See staircases for how long stair work usually takes.

Acclimation: measured, not counted

Wood flooring needs to reach a moisture level that suits your home before it goes down. Installed too wet, it shrinks and gaps. Installed too dry, it swells and can cup or buckle.

The old rule of thumb was to leave boxes in the room for a set number of days. A better approach is to measure. A moisture tester checks the boards and the subfloor, and the installer compares the readings against the manufacturer’s specified range. When they are within range, the floor is ready, whether that took two days or longer.

What you can do to help:

  • Let the material be delivered to the rooms where it will be installed, not a garage or porch.
  • Keep the home at normal living conditions from delivery onward, with heating or air conditioning running and indoor humidity held between 30 and 50% (the NWFA band, as reported by Alexanian).
  • Do not open boxes unless the installer asks you to. Some products should acclimate in the box, some open.
  • Keep wet work (painting, drywall mudding, tiling) finished well before delivery so it does not add moisture.

We log board and subfloor readings before the first row goes down [CONFIRM].

One week before

  • Empty closets that are getting new floors.
  • Pack fragile items from shelves in rooms being worked on and in neighbouring rooms. Nail guns and rubber mallets cause vibration.
  • Take pictures and artwork off walls next to the work area.
  • Confirm whether furniture moving is included or whether you need to do it.
  • Arrange pet care or a boarding day if your animals are anxious with noise and strangers.
  • If you have a home alarm, plan how the crew will get in.

The day before

  • Clear all furniture, rugs and floor items from the work rooms (unless moving is in your quote).
  • Clear a path from the door to the rooms, and from the rooms to wherever cutting will happen.
  • Unplug and move electronics, and coil up cables.
  • Take down curtains that touch the floor.
  • Remove anything from under beds and in low cabinets near the work area.
  • Set up a closed room for pets with water, food and bedding.
  • Set up a play space for kids well away from the work area.
  • Vacuum the floors being removed. It makes the first hour less dusty.
  • Charge your phone and save your project lead’s number.

During the installation

HVAC and air

  • Keep heating or cooling running at normal settings. Turning it off changes the humidity the floor is installed at.
  • Ask whether floor vents need covering during removal and cutting. Dust in ducts travels through the house.
  • If you have a humidifier on the furnace, leave it at its usual setting unless your installer suggests otherwise.
  • Change the furnace filter after the job if there was demolition or sanding.

Pets and kids

  • Keep pets closed in their room for the whole working day. Open doors, nails and offcuts are a real hazard.
  • Keep children out of the work area entirely. A tape line across the doorway helps younger kids understand the rule.
  • Watch out for staples, nails and tack strips at the end of each day near doorways.

Your role

  • Be reachable, especially on the first day. If the subfloor turns out to need more work than expected, a fair contractor will stop, show you photos and ask before going further.
  • Check the first few rows with the installer. Direction, layout and pattern are easiest to change early.
  • Expect an end-of-day update on progress and the plan for tomorrow.

After the installation

  • Walk the floor with the installer in good light. Note anything that needs fixing on a written list.
  • Ask about cure times. Glue-down floors and site-applied finishes need time before traffic and furniture.
  • Put felt pads on every chair, table and sofa leg before it goes back.
  • Wait before laying rugs, especially with rubber backing, on new finishes. Ask your installer how long.
  • Lift heavy furniture into place rather than sliding it.
  • Keep a few spare boards from the job in a dry closet for future repairs.
  • Keep humidity steady through the first winter, when wood floors show the most movement. See why hardwood floors gap in winter.
  • File the product details, warranty and care guide somewhere you will find them.

Common delays and how to dodge them

Cause of delayHow to prevent it
Elevator not booked or double-bookedBook early, get it in writing, confirm the day before
Material too wet or too dryDeliver early and keep the home at normal conditions
Furniture still in the roomsClear it the day before or confirm moving is included
Surprise subfloor workAsk for a levelling allowance in the quote and be reachable
Wrong trim or transitionChoose them with the floor and check the order

Ready to book?

Good preparation makes installation days calm and short. When you request a free quote, we will walk through this list with you, note anything specific to your home or building, and put the dates, the acclimation plan and every line item in writing. You can also read about our hardwood installation and vinyl plank services.

Related services

[CONFIRM] owner or lead installer name, [CONFIRM] Owner and lead installer

[CONFIRM] Two sentences on experience and training.

Frequently asked questions

How long should new flooring acclimate before installation?

There is no fixed number of days that suits every product and every home. The flooring is ready when moisture readings of the boards and the subfloor are within the range the manufacturer specifies. Some products, like many rigid-core vinyls, need little or no acclimation; solid wood usually needs the most.

Can I stay home during flooring installation?

For most click and nail-down installs, yes, as long as you can live around closed-off rooms. Glue-down work and anything with strong-smelling adhesive or finish may be a good time to stay elsewhere, especially with young children or pets.

Do I need to remove baseboards myself?

Usually not. Most quotes include removing and reinstalling or replacing baseboards. Check your quote, because some contractors list it separately or expect it done beforehand.

Should I paint before or after new floors go in?

Most people paint walls before the floor goes in, then touch up baseboards and trim after, because new or reinstalled trim usually needs a final coat anyway.