Hardwood installation
Solid oak, maple and walnut nailed down over a sound wood subfloor, with moisture readings on record and start and finish dates written on your quote.
Toronto and GTA flooring contractor
Hardwood, engineered, vinyl plank, laminate and tile, plus refinishing, stairs and repairs. You get a written, itemized quote, a fixed start and finish date, and a crew that cleans up every day.
Services
Supply and install or install only. Refinishing, repairs and stairs to bring existing floors back.
Solid oak, maple and walnut nailed down over a sound wood subfloor, with moisture readings on record and start and finish dates written on your quote.
Screen and recoat for tired finish, full sanding for scratches and wear, and stain changes tested on your own floor before we commit.
A real wood surface on a stable layered core, installed floating, glued or nailed depending on what is underneath, for condos, basements and houses alike.
Luxury vinyl plank and SPC rigid core, clicked together or glued down, for basements, kitchens, rentals and homes with pets and kids.
A hard-wearing, wood-look floor at a lower price, laid over the right underlay with expansion gaps and transitions done properly.
Porcelain and ceramic floor tile for the rooms that take water, salt and boots, laid flat on a prepared base with grout lines you can sight down.
Refinished, capped or rebuilt stairs that match the floors at the top and bottom, priced per step so you can see the total before we start.
Targeted repairs for damaged, squeaky or patched hardwood, with new boards woven in and colour matched so the fix does not show.
Flooring for condo suites, offices, shops and rental units, with board paperwork, acoustic underlay and building logistics handled before the first box arrives.
Five steps, with no guesswork about cost or timing.
Send the form or call. We reply within one business day [CONFIRM] to book a free visit.
We measure every room, check the subfloor and moisture, and talk through materials that suit your home.
Materials, labour, prep, removal, disposal and trims are listed line by line, with a start date and finish date.
We cover finished surfaces, contain dust and clean up at the end of every day.
We walk the floor with you, fix anything on the spot, and leave care instructions and your warranty in writing.
Why torontofloors
These are the things homeowners say go wrong most often with flooring contractors. Here is how we handle each one.
Surprise charges
Itemized quotes with a named subfloor levelling allowance [CONFIRM]. If we find something hidden, we show you photos and get your written OK before any extra work.
Dust and mess
Floor protection and dust walls go up first. We cut outside where possible [CONFIRM] and vacuum and wipe down at the end of every day.
Missed dates
Both dates are on your quote. One named project lead [CONFIRM], the same crew throughout, and an end-of-day text update.
Patchy finishes
Stain samples on your own sanded floor, buffing between coats, and a final walkthrough in good light.
Defects left behind
We walk the job with you and fix anything on the list within [CONFIRM] business days.
Problems months later
Moisture readings on record, manufacturer instructions followed, and a written workmanship warranty [CONFIRM length].
Service area
From century homes in East York to new condos in Vaughan and Mississauga, each area has its own housing stock and its own flooring challenges. Find yours for local details.
It depends on the material, the size of the space, and the condition of the subfloor. Our cost guide covers typical installed ranges by material. Your quote from us is written and itemized, so you see materials, labour, prep, removal and disposal as separate lines before you agree to anything.
Both. We can supply flooring from our suppliers [CONFIRM: supplier names or showroom], or install material you have already bought. If you supply it, we check it on delivery so problems are caught before it goes down.
Most single-floor installs in a house or condo take two to four working days, and a refinish of a main floor usually takes three to four days including cure time. Your quote includes a start date and an expected finish date. [CONFIRM typical durations]
Yes. We handle the paperwork most Toronto condo boards ask for: certificate of insurance, underlay specification and sound rating, and elevator and loading dock bookings. Ask your property manager for the building's flooring rules early, because approval can take a week or more.
Please clear small items, electronics and anything fragile. We can move standard furniture [CONFIRM: included or quoted as an extra], and we list it on the quote either way so nothing is a surprise.
Yes. Our workmanship is covered by a written warranty [CONFIRM length and terms], on top of the manufacturer's product warranty. If something we installed is not right, we come back and fix it.
Why hardwood floors gap in winter in Toronto: furnace-dried air, the 30 to 50% humidity range, humidifiers, and how to tell normal gaps from a real problem.
Refinish or replace hardwood floors? Check board thickness and wear layer, compare screen and recoat with a full sand, and see public Toronto cost ranges.
How to prepare for flooring installation: a checklist for the weeks before, day before, install days and after: acclimation, pets, kids, condos and HVAC.
We reply within one business day [CONFIRM] to book a free in-home measure. Your quote is written and itemized: materials, labour, prep, removal and disposal, so there are no surprises later.
Tell us about your floors. We will book a visit, measure, and send a quote that lists every cost up front.