Condo and commercial
Flooring for condo suites, offices, shops and rental units, with board paperwork, acoustic underlay and building logistics handled before the first box arrives.
City of Toronto
North York splits between 1950s bungalows and split-levels on quiet crescents and the condo towers of Yonge Street. Each needs a different plan.
North York grew fast after the Second World War. By the 1950s and 1960s farmland had become crescents of bungalows and split-levels, and later the stretch of Yonge between Sheppard and Finch became North York Centre, now lined with condo towers. Most of our calls here come from one of those two worlds, and the work looks very different in each.
| 1950s house | Yonge corridor condo | |
|---|---|---|
| Subfloor | Plank or plywood over joists | Concrete slab |
| What is often underneath | Hardwood under carpet | Laminate or engineered |
| Usual choice | Refinish or new hardwood | Engineered or rigid vinyl |
| Paperwork | Usually none | Board approval and acoustic reports |
| Access | Driveway | Booked elevator and loading dock |
In Lawrence Manor, small builders bought serviced lots in the early 1950s, and bungalows, side-splits and back-splits still fill many streets. Bayview Village followed from 1954 with ranch bungalows and split-level houses. Where original hardwood survives under carpet, it can often be refinished rather than replaced.
Split-levels add a twist: every half flight is a transition. We plan the stairs with the floors so the nosing, the treads and the landing all match, instead of bolting on a mismatched reducer at the end.
Basements here have often been finished two or three times. The slab gets moisture readings before anything goes down, and only then do we choose between vinyl plank, engineered or tile.
Much of Willowdale’s older stock of bungalows has been replaced by large new homes since the 1990s. Those projects tend to want wide plank hardwood installation throughout, plus stairs, so we work closely with builders on acclimation and humidity before the boards arrive.
In a tower at Yonge and Sheppard, the floor itself is the easy part. The board approval, acoustic underlay, insurance certificate and elevator bookings take the planning. We prepare the package your management office asks for and work inside building hours. Our condo and commercial page explains the full process.
Whether it is a bungalow on a Don Mills crescent or a suite above Sheppard station, the visit is the same: we measure every room, read moisture, look at the subfloor where we can, and note stairs and transitions. You get one itemized quote, a start date and a finish date, and a named contact for the job [CONFIRM].
Live a little further west in York or east in Scarborough? We cover those too. Set up a free measure and we will look at what your North York floor needs.
Bayview Village homes were mostly built between 1954 and 1964, and Lawrence Manor is dominated by bungalows, side-splits and back-splits. Split-levels mean short runs of stairs between floors and several transitions to plan.
Built in the 1950s and 1960s as a planned new town, with 53 house designs on curving streets and cul-de-sacs. Layouts vary from house to house, so we measure every room rather than assume.
North York Centre, between Sheppard and Finch on Yonge, is one of the city's designated urban centres and is lined with high-rise condos. Concrete slabs and condo board approval come with every job.
Backsplits and sidesplits have several half flights. We plan nosings, reducers and stair finishing at the measure so every level meets cleanly.
Many 1950s basements have been finished more than once. We test the slab for moisture before recommending rigid vinyl, engineered or tile below grade.
Elevator bookings, loading dock times, protective coverings and quiet hours. We fold these into the schedule so the start date is real.
Each condo corporation sets its own sound rule. We supply product and underlay test reports, naming whether a figure is lab IIC or field FIIC.
Flooring for condo suites, offices, shops and rental units, with board paperwork, acoustic underlay and building logistics handled before the first box arrives.
A real wood surface on a stable layered core, installed floating, glued or nailed depending on what is underneath, for condos, basements and houses alike.
Luxury vinyl plank and SPC rigid core, clicked together or glued down, for basements, kitchens, rentals and homes with pets and kids.
Refinished, capped or rebuilt stairs that match the floors at the top and bottom, priced per step so you can see the total before we start.
Solid oak, maple and walnut nailed down over a sound wood subfloor, with moisture readings on record and start and finish dates written on your quote.
Over a concrete slab, most owners pick engineered hardwood, rigid core vinyl or laminate, always with the acoustic underlay your building specifies. Solid hardwood is rarely suitable. Your property manager can tell you the sound rating the board needs, and we supply the test reports to show the product meets it.
We treat the stairs as part of the floor plan, not an afterthought. Depending on the material, short flights can be refinished, capped or fitted with new treads and matching nosings. We quote each option so you can compare.
Solid hardwood is a poor fit below grade. Engineered hardwood is an option over a slab that tests dry and flat, with the right barrier, and rigid core vinyl or tile handle moisture better still. We take moisture readings first and recommend from the results.
Often it is, if the boards still have enough wood above the tongue for another full sanding. We check board thickness and past repairs before recommending refinishing over replacement.
We reply within one business day [CONFIRM] to book a free in-home measure. Your quote is written and itemized: materials, labour, prep, removal and disposal, so there are no surprises later.
Tell us about your floors. We will book a visit, measure, and send a quote that lists every cost up front.